Media Hub
Case Studies
Featured
Re‑Anchoring Success: Expandable Anchoring Technology Enables Precision Recovery of a 30” Conductor
Wellbore Integrity Solutions (WIS) delivered a tailored technical solution to a complex challenge encountered during a plug and abandonment (P&A) campaign in the North Sea. The operator approached the WIS UK team with a requirement to recover a parted 30” conductor during offshore operations. The challenge arose during a triple‑string cutting operation involving 13-3/8”, 20”,…
MOST RECENT
Newsroom
News Releases
Houston, TX – April 2025 — Wellbore Integrity Solutions Recognized for Safety Excellence with 2025 Platinum Workforce Safety Seal
April 28, 2026
News Releases
Wellbore Integrity Solutions Has Successfully Secured a $125 Million Nordic Bond Financing with a Total Framework of $200 Million
October 9, 2025
Case Studies, News Releases
TrackMaster Nexus™ Doubles Tripping Speed, Achieves Low-Side Exit in North Slope Alaska Re-Entry Well
August 5, 2025
Case Studies, News Releases
Successful Window Milling in 7 inch x 9-5/8 inch Casing Using 5-5/8 inch FastTrack Hybrid Bi-Mill in Mexico
July 25, 2025
Most Recent
Case Studies
Case Studies
Re‑Anchoring Success: Expandable Anchoring Technology Enables Precision Recovery of a 30” Conductor
May 6, 2026
Case Studies
TrackMaster Select™ Whipstock System Enables Successful Sidetrack in Challenging Extended‑Reach Well
April 21, 2026
Case Studies
Precision Sidetrack Execution in 10” Casing Using the TrackMaster Select™ System
April 10, 2026
Case Studies
Adapting Oilfield Technology to Solve Water Seepage Challenges at a Hydroelectric Dam
February 10, 2026
Get the latest news alerts straight to your inbox.
