- July 10, 2023Results: • Accomplished sidetrack successfully in a hard rock formation. • The TrackMaster Select System was retrieved after drilling operations…
- July 10, 2023Results: • The tool was deployed into the well beyond 4000 m (13123 ft) depth within 30 minutes. • The…
- April 25, 2023Results: • A successful milling operation with no non-productive time (NPT). • An improvement of 182% in overall ROP. •…
- March 20, 2023Results: • Successfully retrieved fish on the first attempt enabling the customer to continue with the planned completion with minimal…
- March 20, 2023Results: • A rapid response mobilization of equipment and personnel to the rig site was conducted efficiently. • In the…
- March 15, 2023Results: • Successful single trip 9 5/8 inch x 13 3/8 inch dual casing exit • Completed the dual casing…
- March 8, 2023Results: • A high-quality window was created in the horizontal section • Zero hours of non-productive time (NPT) reported •…
- February 27, 2023Results: • Successfully completed full-gauge dual casing window and drilled 5 m of rathole • Subsequent drilling BHA passed the…
- February 1, 2023Results: • Retrieved 450m of ESP cable with a modified rope spear • Retrieved 350m of ESP cable with a…
- January 16, 2023TruEdge technology enables line recovery and a subsequent successful sidetrack. Results: An industry-first application for both section milling and cutting…