Newsroom
Case Studies
Re‑Anchoring Success: Expandable Anchoring Technology Enables Precision Recovery of a 30” Conductor
May 6, 2026
News Releases
Houston, TX – April 2025 — Wellbore Integrity Solutions Recognized for Safety Excellence with 2025 Platinum Workforce Safety Seal
April 28, 2026
Case Studies
TrackMaster Select™ Whipstock System Enables Successful Sidetrack in Challenging Extended‑Reach Well
April 21, 2026
Case Studies
Precision Sidetrack Execution in 10” Casing Using the TrackMaster Select™ System
April 10, 2026
Case Studies
Adapting Oilfield Technology to Solve Water Seepage Challenges at a Hydroelectric Dam
February 10, 2026
Case Studies
Proven Single-Trip 14″ Heavy-Wall Q-125 Casing Exit Using the TrackMaster™ Whipstock System
February 9, 2026
Case Studies
ProLATCH™ Sets New Benchmark: Triple‑String Cut (13⅜” × 20” × 30”) Completed in Under 3 Hours
February 4, 2026
Case Studies
ProLatch™: Redefining Multi-String Casing Cutting with a Quad-String Cut in Under 5 Hours
January 23, 2026
Case Studies
ProMAXX® System Provides Trip-Saving Solution for Offshore Operation in UAE
January 20, 2026
Case Studies
Ecuador’s Successful Critical Fishing Operation: Retrieving a Seal Bore Packer and Gravel Pack in a Single Run
January 14, 2026
News Releases
Wellbore Integrity Solutions Has Successfully Secured a $125 Million Nordic Bond Financing with a Total Framework of $200 Million
October 9, 2025
Case Studies, News Releases
TrackMaster Nexus™ Doubles Tripping Speed, Achieves Low-Side Exit in North Slope Alaska Re-Entry Well
August 5, 2025
Get the latest news alerts straight to your inbox.
